surgical data
socket lifting
Implant placement combined socket lifting
Initial panorama x-ray
Sinus grafting performed by Crestal approach on the #16,17 area
SG Implants were installed. Pictures of SST system #15,16 SFSR411 / #17 SFSW511
Primary stability checked with Torque Wrench
The picture taken after the SST implants placed
Healing abutments were inserted
#14, 15, 16 SST implants installed & Healing abutments were inserted. / #27 implant was inserted combined socket lifting
Healing sequences of sinus area
Impression taking with transfer type on the fixture level
G-mask state, trimming was done for gingival forming
Abutment try-in
Resin cap try-in
Final prosthesis
The pictures taken after the final prosthesis on the Rt Molar
The pictures taken after the final prosthesis on the LT 2nd molar after 5 months
Final prosthesis x-rays
Finished panoramic x-ray